Call / WhatsApp+44 7704039352

Find us:Chadderton, Oldham OL9 9PA, United Kingdom

Solutions

‘Coopers’ is a motor vehicle repair (MVR) workshop located on a small industrial estate just off the public highway.


Site A is one of the sites due to be managed by HNB. It has approximately six hectares of rural land, with some ditches and uneven ground.


7. Explain how the ‘driver fatigue risk management policy’ has not been effective?


(b) What aspects of the response to the fuel spill worked well?


(a) Discuss the positives and negatives for storing diesel on site.


6. HNB is now considering storing diesel on site in storage tanks to refuel plant machinery.


(b) The pond filling activity has been completed, the pumps have just been shut down, and there is a need to dismantle and remove them from the site onto a flatbed truck.


5. (a) What should have been considered before starting the pond filling activity?


Task 5: Pumping water into the pond and removing the water pumps from the site


What sections would you add to the permit, to further minimise risk?


4. Two of the excavations were underneath high-voltage overhead power lines. The electricity supplier was able to isolate these lines. A high-voltage permit- to-work would be required (see supporting document 1 (SD1)).


(c) Explain what further control measures should be put in place to help reduce the risk of a pressure system failure.


(b) Explain why air compressor-related activities could be hazardous.


3. (a) Why would the compressor unit be classified as a pressure system?


First<<242526272829>>Last