Call / WhatsApp
+44 7704039352
Find us:
Chadderton, Oldham OL9 9PA, United Kingdom
My Account
Home
About Us
FAQs
Solutions
Order Now
Contact Us
Blog
Home
Solutions
Solutions
‘Coopers’ is a motor vehicle repair (MVR) workshop located on a small industrial estate just off the public highway.
Oct 13 2025
179.00
Site A is one of the sites due to be managed by HNB. It has approximately six hectares of rural land, with some ditches and uneven ground.
Oct 13 2025
199.00
7. Explain how the ‘driver fatigue risk management policy’ has not been effective?
Oct 13 2025
199.00
(b) What aspects of the response to the fuel spill worked well?
Oct 13 2025
199.00
(a) Discuss the positives and negatives for storing diesel on site.
Oct 13 2025
199.00
6. HNB is now considering storing diesel on site in storage tanks to refuel plant machinery.
Oct 13 2025
199.00
(b) The pond filling activity has been completed, the pumps have just been shut down, and there is a need to dismantle and remove them from the site onto a flatbed truck.
Oct 13 2025
199.00
5. (a) What should have been considered before starting the pond filling activity?
Oct 13 2025
199.00
Task 5: Pumping water into the pond and removing the water pumps from the site
Oct 13 2025
199.00
What sections would you add to the permit, to further minimise risk?
Oct 13 2025
199.00
4. Two of the excavations were underneath high-voltage overhead power lines. The electricity supplier was able to isolate these lines. A high-voltage permit- to-work would be required (see supporting document 1 (SD1)).
Oct 13 2025
199.00
(c) Explain what further control measures should be put in place to help reduce the risk of a pressure system failure.
Oct 13 2025
199.00
(b) Explain why air compressor-related activities could be hazardous.
Oct 13 2025
199.00
3. (a) Why would the compressor unit be classified as a pressure system?
Oct 13 2025
199.00
First
<<
24
25
26
27
28
29
>>
Last