Call / WhatsApp
+44 7704039352
Find us:
Chadderton, Oldham OL9 9PA, United Kingdom
My Account
Home
About Us
Solutions
Order Now
Contact Us
Home
Solutions
Energy Efficient Construction from Design to Use
Apr 25 2024
89.00
P6 Produce specifications, schedules and an outline construction health and safety phase plan for a given project.
Apr 25 2024
89.00
M2 Analyse the importance of clash detection and information coordination.
Apr 25 2024
89.00
Analyse the ways in which different forms of contractual relationships between stakeholders influence flow of information in a construction project.
Apr 25 2024
89.00
Produce a report of all of your calculations, research and final results identifying the tasks carried out. This should be in the form of a technical report identifying your sources of information with suitable referencing.
Apr 25 2024
89.00
After completing your design of the building fabric and services, any carbon required to be offset will have to be identified and you will be required to show how this additional carbon can be offset.
Apr 25 2024
89.00
You will be designing the services required for the building, so it will be your responsibility to ensure that these are as efficient as possible and comply with the current Building Regulations
Apr 25 2024
89.00
Critically evaluate the relationship between design and project stages, highlighting the processes and procedures to ensure information coordination throughout.
Apr 25 2024
89.00
Initially, you should establish the scope for the project. In this case, this will involve identifying U values, design temperatures and air change rates for the building. The occupancy of the building will also have to be established.
Apr 25 2024
89.00
Since January 2022, Welsh Government has required that all new school buildings have to achieve Net Zero status.
Apr 25 2024
89.00
LO4 Present a construction information package, highlighting the coordination of information between different project stakeholders to ensure accuracy.
Apr 25 2024
89.00
LO3 Produce design propositions that address project requirements defined through feasibility stages
Apr 25 2024
89.00
LO2 Explain the different types of construction information developed through the course of a project
Apr 25 2024
89.00
LO1 Discuss the stages of a design process and the types of information required to communicate, share and manage the project process
Apr 25 2024
89.00
First
<<
8
9
10
11
12
13
>>
Last