What sections would you add to the permit, to further minimise risk?


4. Two of the excavations were underneath high-voltage overhead power lines. The electricity supplier was able to isolate these lines. A high-voltage permit- to-work would be required (see supporting document 1 (SD1)).


(c) Explain what further control measures should be put in place to help reduce the risk of a pressure system failure.


(b) Explain why air compressor-related activities could be hazardous.


3. (a) Why would the compressor unit be classified as a pressure system?


(b) Excluding lifting accessories, what control measures should be considered when carrying out the pond lining lift?


2. (a) What should have been considered when selecting lifting accessories for the pond lining lift?


(b) What improvements would make the excavation work safer?


1. (a) What was positive about the way the excavation work was managed?


Habitect Nature Build (HNB) employs 150 workers and have 15 years’ experience in the construction industry. They are one of the contractors chosen to help deliver a large infrastructure project for a client.


9. Why should a special case risk assessment for young workers be completed at Dough Delight?


8. Comment on the influence of peers at Dough Delight.


7. How could carrying out health and safety inspections before the accident have benefitted Dough Delight?


6. What would be the benefits of worker and employer involvement in workplace health and safety consultation at Dough Delight?